Photo: Altera Infrastructure

Hose Replacement for Altera Infrastructure

Facts

Partner: Altera Infrastructure
Delivery: Installation of 380 hoses on cranes that have been pre-produced. The hoses are ordered directly from the hose register in THM, and the register is updated after demobilization.
Location: Randgrid FSO

Contact

Rune Sigurdsen

Sales Director THM

Related Links

More Projects

THM at Odfjell Deepsea Yantai

Hose Replacement on Safe Boreas

CCB Subsea uses THM

Scroll to Top

Search

Search